2018
Christchurch

PROJECT

Lyttelton Port Channel Dredging Project

CLIENT

Lyttelton Port Company

Our team gets results:

Ian Currie

 

lyttelton port company channel dredging

In a 24/7 operation, the Fairway super dredge lengthened the Lyttelton Port channel by approximately 2.5km and widened it by 20 metres and deepened it by up to two metres. The channel provides Canterbury’s importers and exporters the best possible and most-cost effective international shipping solutions.

Suction pipes moved across the seabed suctioning mud and silt into a hopper with a capacity of 36,000m3. Material was held in the hopper until full and then disposed of at an approved spoil ground located 6km offshore.

Lyttelton Port Company implemented the largest environmental monitoring programme ever undertaken for a New Zealand dredging project. 14 dedicated gauges deployed throughout the harbour and off-shore measured a range of factors including water turbidity, pH and temperature. The project included the installation of nine new marine based navigational aid towers, six land based navigational towers and six new spar buoys throughout the harbour.

2014
Auckland

PROJECT

Hobbs Global warehouse and office

CLIENT

Auckland Airport

Our team gets results:

Paul Crum

 

Hobbs Global

This dynamic office and warehouse development for Hobbs Global is at the hub of the commercial district at Auckland Airport.

30 Verissimo Drive is a medium sized 3,500m² square metre warehouse / office facility with a 1,800m² yard for tenant Hobbs Global Solutions. As a standalone industrial facility, it contains operational areas, functional and flexible internal layouts and an expansive yard area and breeze way.

The Building Intelligence Group managed the design, consents, procurement of the contractors, value engineering and construction management and took the role of Engineer to the Contract.